Understanding the Lincolnville CRA

The Lincolnville Redevelopment Plan is a public framework for protecting the neighborhood’s historic character, supporting residents, improving connections, and encouraging locally appropriate economic activity. It began with community input and a 2013 plan, then was amended in 2017. This guide puts the plans’ key commitments beside the latest City progress information we located.

In this guidePage 1 of 10
  1. 1Understanding the Lincolnville CRA
  2. 2Institutional Landmarks
  3. 3Parks and Named Places
  4. 4Twine Park Proposal · Members only
  5. 5The Historic District and Home History
  6. 6Fix-It-Up and Staying in Place
  7. 7How to Take Part
  8. 8Community Requests for the CRA
  9. 9Homes Not Hotels
  10. 10Every Home Known: The Home Story Package

From Plan to Progress

A Root & Simmer guide to Lincolnville’s redevelopment plans

What the City planned. What current public records show. What residents still need to be able to track.

Status checked November 21, 2026

Three figures that set the context

75% · 54% · 30.4%
Black share of the Lincolnville CRA population in 1990, 2000 and 2010, as reported in the 2013 plan. A 44.6 percentage-point decline over twenty years.
67%
2011-2015 ACS estimate: share of 776 Lincolnville housing units built before 1940.
23.9% / 18.1%
2015 ACS estimate: households below poverty in the amendment’s Lincolnville geography / citywide.

These are dated planning and Census/ACS measures, not current 2026 counts. The 2017 amendment reports margins of error for its ACS estimates. They show why preservation, housing stability, and resident participation need to be considered together.

The three plans-in-context figures point to different pressures: a substantial historic demographic shift, an aging housing stock, and continuing income challenges. They should be read with their years and sources attached, not treated as a current headcount.

Root & Simmer Hospitality Co. is an independent Lincolnville-focused business. This guide is community education, not an official City of St. Augustine or Community Redevelopment Agency (CRA) publication. Root & Simmer does not speak for all residents, the CRA, or the Steering Committee and does not imply City or CRA endorsement.

1 | What the plans promised to address

The 2013 plan was adopted by City Commission Resolution 2013-14 on April 8, 2013, after a public charrette held in January. It grouped proposals into three planning periods. The plan says its project schedule was flexible and subject to changing market conditions and available funding; the dates are not proof that every project was funded or completed on time.

Short range (2014-2018)
One-way/on-street parking, overlay zoning, remediation of blighted structures, and Fix-It-Up assistance.
Mid range (2019-2028)
Home repair and emergency assistance, the South Street sidewalk, and a children’s splash area.
Long range (2029-2033)
Down-payment assistance, Matanzas Marshwalk, riverfront pavilion/festival grounds, sidewalk improvements, stormwater planning, and off-street parking.

Across those phases, the plan linked five priorities

  • Resident stability: help people remain in their homes and maintain housing choices.
  • Historic character: preserve the historic neighborhood and African American heritage.
  • Neighborhood connections: sidewalks, streetscape, parks, stormwater and other public improvements.
  • Local services: support neighborhood-scale businesses and services residents can reach locally.
  • Participation: create a Steering Committee to work with the CRA on plan implementation.

The South Street sidewalk

The plan proposed a four-foot sidewalk on one side of South Street between Riberia Street and Lake Maria Sanchez. It described this as a missing pedestrian connection and cited the need to protect signature oak trees and work within a narrow right-of-way. The plan page describes a street segment; it does not identify 74 South Street as an individual project site.

The 2017 amendment

After additional public input, the City amended the plan. Its stated priorities are to preserve African American heritage and retain long-term residents, preserve Lincolnville’s historic character, and conduct neighborhood improvements. The amendment adds or reinforces elements of the 2013 plan; it should be read alongside the original plan.

The 2017 amendment records 22 usable survey responses and separate focus-group attendance counts of 24, 17, and 31. The document does not give a unique combined participant count or describe those counts as a vote by all Lincolnville residents.

2 | The gains, the pressure, and the open questions

Latest City snapshot located: the CRA Annual Report for Fiscal Year 2024-2025. Its LCRA district summary lists four projects initiated, two completed, twelve active, and $2,870,018 in project/program expenditures. The report says these figures were unaudited when published.

FY2025 City report

2 completed
The project accounting marks Fountain of Youth Elks Lodge rehabilitation and Lincolnville Park in honor of George and Ollie Smith as completed.
12 active
The district snapshot lists twelve active projects; it does not provide a resident-level outcome measure for each project.
$2.87 million
Reported LCRA project/program expenditure figure; the annual report notes that financials were unaudited at publication.
FY2026-2027 budget
The adopted budget schedule is free to read in the Library. Allocations and committed funds are not the same as actual expenditures.

The FY2025 report described these work stages

  • MLK Avenue streetscape: utility undergrounding work depended on securing easements; the report noted the CRA had not received a federal RAISE grant.
  • Hayling Plaza: bidding phase in the FY2025 report.
  • Eddie Vickers Park kayak launch: final design, with construction anticipated in FY2026.
  • Greater St. Mary’s: nearing closeout, expected by FY2026 in the report.
  • Trinity Independent: a multi-year project with repairs planned in phases.
  • Fix-It-Up: the report recorded $317,270 in FY2025 program investment and described assistance of up to $100,000 for qualifying residents.

These are the City’s report-date descriptions, not a live November 2026 status check. The report does not settle the status of every older 2013 project, including the South Street sidewalk proposal or the broader Washington Street business-district vision. Not being mentioned is not proof that work was canceled.

Two dates need to be read distinctly

The 2013 plan says it guides redevelopment through December 31, 2033, and that projects financed by increment must be completed by that date. Separately, the City’s FY2025 annual report lists the Lincolnville CRA sunset as April 2033. The plan deadline and reported CRA sunset are not interchangeable. This guide reports both documents as written; it does not claim December 31 is the CRA’s legal sunset date.

Where We Stand Today — What Happens Next?

  • RAISE grant: the FY2024-2025 annual report noted the CRA had not received a federal RAISE grant for the MLK Avenue streetscape. No later status is on file.
  • Home repair help: the report recorded $317,270 in FY2025 Fix-It-Up program investment and described assistance of up to $100,000 for qualifying residents.
  • Foreclosures in Lincolnville: Missing Data. No sourced count is on file yet.
  • Next dates: the CRA sunset listed for April 2033, and the 2013 plan’s December 31, 2033 deadline for increment-financed projects.

3 | Building the bridge residents can use

The plan names resident participation as part of implementation. The City describes the CRA Board as the City Commission, guided by a separate Lincolnville Steering Committee. Residents benefit when the path from daily experience to a public decision is understandable and when follow-up is visible.

Root & Simmer’s independent role can be practical:

  • Explain the 2013 plan, 2017 amendment, budget items, meeting records and programs in plain language.
  • Gather community ideas and concerns by topic or address, with consent and respect for privacy.
  • Separate documented City facts, resident accounts, proposals, and questions still awaiting a record.
  • Point residents to official meeting, public-comment, records-request, and CRA channels.
  • Keep a public follow-up record: what was raised, where and when it was submitted, what response or record was found, and what remains open.

A Root & Simmer poll or idea collection is independent and advisory. It is not a City/CRA survey, committee vote, or official ballot, and it should never be described as representing every resident.

What the community can ask next

  • Which 2013 plan actions and 2017 amendment projects are complete, active, paused, or not currently scheduled?
  • What current budget, grant, or other funding supports each active project?
  • What input was gathered for each decision, and how was it reflected in the decision or project design?
  • What is the verified status of the South Street sidewalk and Washington Street business-district work?
  • What current City document establishes the CRA sunset date?

Public documents on this CRA page

The annual report and the public budget documents are free to read in the Library, with no login. Meeting records, Root & Simmer’s budget analysis and research are in the members-only CRA archive.

Free budget documents and the annual report in the Library

The Lincolnville Corridor is the journey. Little Africa is the heartbeat. Root & Simmer Hospitality Co. is the gateway. Together, we create the experience.

Independent community education. Not an official City or CRA publication.

Questions? Get in touch.

Kimberly Joyce, Founder & Director of Community Partnerships